Background & Objectives

Prospect Hospice, based in Wroughton, Swindon, provides specialist end-of-life care, supporting patients and their families affected by life-limiting illnesses. Creating a comfortable, safe environment is essential for the wellbeing of patients, visitors, and staff.

During a planned plant room replacement, a leading building services contractor partnered with Rapid Energy to provide a reliable temporary heating and hot water system. The objective was clear: maintain full operational continuity throughout the works with zero disruption.

300kW Packaged Boiler

Equipment Supplied

  • 1 × 300kW Packaged Boiler

  • 1 × 250kW Plate Heat Exchanger

  • 1 × Expansion Vessel

  • 10 × 10m 2″ HTG Hoses

  • 5 × 3m 2″ HTG Hoses

  • 15 × 10m Potable Water Hoses

  • 10 × 5m Potable Water Hoses

  • 5 × DN65 PN16 Flange to 2″ Camlock Adaptors

  • 5 × HWS Camlock to BSP Adaptors

  • 1 × Auto Air Vent

  • 12.5 × 25m 240V 16A Power Leads

  • 5 × 240V 16A Plug Top Adaptors

Challenges

  • The hospice environment meant that heating and hot water could not be interrupted at any point, as this would directly affect vulnerable patients.

  • The temporary boiler needed to be completely reliable, with zero tolerance for breakdowns or performance issues.

  • Continuous, real-time monitoring was essential to ensure any potential faults could be identified and addressed before they caused disruption.

  • Installation and commissioning had to be carried out smoothly and discreetly, avoiding any disturbance to patients, staff, or visitors during the project.

Challenges for Temporary Boiler Solution for a Critical Care Facility

Strategy

Our team deployed a 300kW packaged gas boiler with a plate heat exchanger, integrated potable water connections, and all necessary adaptors and power supply leads. The temporary boiler was:

  • Delivered and installed with minimal disruption to the site.

  • Commissioned quickly to maintain operational continuity.

  • Equipped with remote monitoring, enabling our engineers to track performance and respond immediately to any issues.

By combining the right equipment with expert installation and oversight, we created a temporary solution that was both reliable and low-risk.

Location

Outcome

The hospice continued to operate safely and comfortably throughout the plant room replacement. Patients, staff, and visitors experienced no disruption, while the contractor had complete assurance that the system was monitored and reliable. The project delivered peace of mind and operational resilience when it mattered most.

300kW packaged boiler

Customer Quote
“We acted fast to deliver a reliable heating system with remote monitoring to ensure Prospect Hospice stayed fully operational during their plant room works – with minimal fuss and zero disruption.”

– Business Development Manager, Rapid Energy

Get in touch

  • This field is for validation purposes and should be left unchanged.
  • Drop files here or
    Max. file size: 50 MB.
    • FEBE Growth 100 2025
    • FEBE 2024
    • Neutral Carbon Zone Gold Certification
    • ISO-9001 Certified Logo
    • OFTEC Accredited Logo
    • CHAS Accredited Logo
    • Constructionline Gold Logo
    • GAS Safe Logo
    • SSIP Logo
    • F-Gass Certified
    • SafeContractor Logo
    • Cyber Essentials Logo