Background

A prominent construction firm based in the UK reached out to Rapid Energy for assistance on a multi-phase project located in Walsall.

Our client is renowned as a top-tier construction company, celebrated for its innovative methodologies and steadfast dedication to quality. With a legacy spanning several decades, they have solidified their position as a reliable collaborator, delivering exemplary projects across diverse sectors such as infrastructure, commercial ventures, residential developments, and healthcare facilities.

The ultimate beneficiary of this projects was an NHS practice, and the project’s objective centered on enhancing the existing space to accommodate increased capacity requirements.

Our project entails the installation of electric boilers for screed drying purposes across three different wings of the hospital, thus necessitating three distinct phases. This initiative is in preparation for a new facility slated to open its doors in Spring 2024. The forthcoming facility will include a 15-bedded functional ward and a ten-bedded dementia ward.

3-36kW Electric Mobile Boiler

Temporary Boiler Equipment Used

Phase 1:

  • 6 x 22KW Electric Boilers
  • 2 x 36KW Electric Boilers
  • 18 x 1” 3m lengths heating hose

Phase 2:

  • 3 x 22KW Electric Boilers
  • 2 x 36KW Electric Boilers
  • 10 x 1” 3m lengths heating hose

Phase 3:

  • 8 x 22KW Electric Boilers
  • 1 x 36KW Electric Boiler
  • 18 x 1” 3m lengths heating house

 

Click here to view and learn more about the 3-36kW Mobile Electric Boiler, available for short and long term hire.

Challenges Overcome

Given the scale of the project, we successfully coordinated with multiple contractors to ensure seamless progress and adherence to the evolving timeline requirements. Effective communication and collaboration were paramount in navigating the fluid nature of the project milestones.

Movability of the equipment was a key feature requirement for our client. Rapid Energy’s mobile electric boilers are designed and built specifically for the hire industry. And due to their design, each unit can easily be manoeuvred into position as and when required.

For this particular project, our client required the expertise of Rapid Energy’s skilled engineers to carry out the installation and commissioning of the equipment at each phase of the project.

Installation and location

Outcome

Given the scale of the project, we successfully coordinated with multiple contractors to ensure seamless progress and adherence to the evolving timeline requirements. Effective communication and collaboration were paramount in navigating the fluid nature of the project milestones.

Electric Mobile Boiler Solution for NHS Hospital

Get in touch

  • Drop files here or
    Max. file size: 50 MB.
    • This field is for validation purposes and should be left unchanged.
    • ISO 9001 Logo
    • OFTEC Accredited Logo
    • CHAS Accredited Logo
    • Constructionline Gold Logo
    • GAS Safe Logo
    • SSIP Logo
    • F-Gass Certified
    • SafeContractor Logo