During the construction of a major museum development in London, Rapid Energy was appointed to provide a temporary cooling solution to support the building’s infrastructure.
The project required 1.12MW of temporary cooling capacity, alongside the power and supporting equipment needed to create a complete, self-contained system. Rapid Energy was responsible for the design, supply, installation and commissioning of the temporary cooling hire package.
The complete temporary hire package included:


Rapid Energy successfully delivered and commissioned the 1.12MW temporary cooling hire solution safely and on schedule.
The system provided the cooling capacity required to support the museum’s infrastructure while allowing construction activities to continue uninterrupted.
By combining temporary cooling, power generation, electrical distribution and engineered ventilation within one integrated rental solution, Rapid Energy was able to deliver reliable temperature control in an environment where a conventional chiller installation was not possible.
This project demonstrates how we combine specialist hire equipment with engineering expertise to deliver complete temperature control solutions for even the most complex site requirements.