A leading university in the Midlands approached Rapid Energy to provide a temporary cooling solution ahead of its annual graduation ceremony. With up to 1,700 guests expected inside the sports hall, creating a comfortable environment was essential to the success of the event.
Following an initial consultation and site survey, our engineers worked alongside the university’s estates team to develop a solution that would support the graduation while also considering the site’s future heating and cooling requirements.


The temporary cooling hire solution successfully maintained comfortable conditions throughout the graduation ceremony, helping create a positive experience for students, staff, and guests.
By replacing the university’s previous rental setup with a professionally engineered system, Rapid Energy eliminated the reliability concerns that had affected earlier events and provided complete confidence in the performance of the equipment.
Additionally, the enabling works completed as part of the project created a permanent connection point for future temporary heating and cooling equipment, allowing future installations to be completed more quickly, with less disruption and reduced setup costs.
Following the successful installation, the university expressed their satisfaction with both the design and delivery of the project and look forward to working with Rapid Energy on future temperature control hire requirements.
