Project Background

When both of a prestigious boarding school’s existing boilers failed, the loss of heating threatened the comfort of pupils and the continued operation of the boarding facilities.

Located in Kent, the school faced a four-week delay for replacement parts. A temporary heating solution was therefore required to restore the supply of low-temperature hot water (LTHW) to the primary heating circuit and reinstate heating to the pupils’ boarding block.

Following the initial enquiry, Rapid Energy arranged an emergency site survey to assess the existing plant room, establish the site’s requirements and identify a suitable temporary boiler solution.

 

300kW Packaged Boiler

Equipment Used

  • 1 × 300kW oil-fired packaged boiler
  • 1 × 3,000-litre bunded fuel tank
  • 80 metres of 2-inch pipework
  • 2 × 25-metre, single-phase 16A power leads
  • 2 × 2-inch Camlock-to-2-inch PN16 flange adaptors

Challenges

  • Complete heating failure: Both existing 150kW packaged boilers had failed, leaving the heating system without its normal heat supply.
  • Four-week parts delay: Replacement parts were not immediately available, creating a prolonged gap before the permanent system could be restored.
  • Operational continuity: The school needed to reinstate heating to its pupils’ boarding block while minimising disruption to its facilities.
  • Rapid deployment: A temporary solution was required quickly to help the school continue operating.

Graphic showing heating challenges for boarding school in Kent

Our Solution

Rapid Energy arrived on site within two hours of the initial call to assess the existing plant room. Following the school’s instruction, our engineers carried out the installation that same day:

  • A 300kW packaged boiler was deployed to provide the temporary heating capacity required.

  • Our engineers installed 80 metres of temporary pipework, connecting the boiler to the existing heating header to supply low-temperature hot water (LTHW) at 80°C.

  • The fuel tank and electrical supply were connected to prepare the temporary boiler for operation.

  • Once the connections were complete, our engineers commissioned the boiler and confirmed the temperature set points through the building management system (BMS).

  • Following commissioning, the installation was signed off as complete.

 

Education Sector

 

Location

Outcome

Rapid Energy delivered and commissioned a temporary boiler installation following an emergency callout, with the team on site within two hours and equipment deployed following the school’s instruction that same day.

The 300kW boiler provided a temporary heating solution while the school awaited parts for its failed boilers. By responding quickly and integrating the equipment with the existing heating circuit, Rapid Energy helped the school address a critical heating failure and reduce the risk of prolonged disruption to its boarding facilities.

Customer Quote

“With the school facing potential closure and subsequent financial loss, it was imperative we delivered a fast and efficient solution to our clients facility. This is another example of the Rapid Energy team working together to deliver operational excellence for our clients”

Jamie Ross-Davies
Managing Director

Get in touch

  • This field is for validation purposes and should be left unchanged.
  • Drop files here or
    Max. file size: 50 MB.
    • I would like Rapid Energy to contact me as below. I acknowledge that I may withdraw my consent or unsubscribe at any time and that you will not pass my details to anyone. By clicking the Ok button I agree to the privacy policy