Photo of people working inside an office.

Temperature issues in office buildings not only cause complaints but also endanger employee health and the company’s reputation. Whether it’s a broken chiller during a heatwave or a planned shutdown without backup, fast, reliable temperature control is crucial to maintaining comfort.

A poorly controlled indoor climate can reduce employee focus, increase absenteeism, and lower overall performance. Research shows that productivity is significantly impacted when temperatures fall outside the ideal range.

At Rapid Energy, we specialise in delivering temporary heating and cooling solutions that keep offices operational, no matter the challenge. From small office spaces to large, multi-floor buildings, we act quickly to restore comfort and confidence, without disrupting day-to-day business.

Real-World Solutions

Below are three examples where we helped facilities managers overcome critical cooling issues in offices quickly and effectively.

Temporary AC Hire for Multi-Floor Office – Unite the Union, Central London

AC Hire Solution for the Unite The Union
Background

We were contacted by Unite the Union, located in Central London, to provide a temporary air conditioning solution for their 9-story office building. Due to ongoing technical issues with their existing chillers and AHU system, the building had been without operational cooling for some time. With summer approaching, they urgently needed a solution to maintain a comfortable environment for staff.

Equipment Used
Solution

Following a detailed site survey, it was quickly determined that an external chiller/AHU system was not feasible due to space restrictions. Instead, we recommended a combination of local air conditioning units and evaporative coolers to effectively manage the temperature across multiple floors. Each room was measured for heat loss to ensure we specified the right equipment.

We proposed a flexible approach with the option to trial the solution on a single floor before proceeding to a building-wide installation. The trial was a success, reducing internal temperatures and improving comfort for staff. As a result, the client chose to scale up the solution across the entire building and enter into a 3-month minimum agreement, ensuring optimal cooling and energy efficiency.

Read the full case study.

Emergency Cooling During a Heatwave – Tricorn House, Birmingham

Rapid Energy van on the road.
Background

We received an urgent request from the facilities management team at Tricorn House, a prominent office building in Birmingham, which houses over 1,000 professionals. During an unexpected heatwave, the building’s central air conditioning system failed, risking tenant satisfaction and employee well-being. The team needed an immediate cooling solution.

Equipment Used
  • 8 x 4.1kW Spot Coolers
Solution

Given the urgency of the situation, Rapid Energy quickly sourced the required spot coolers from our ready-to-dispatch inventory. Our operations team ensured on-time delivery, and our engineers efficiently installed the units throughout the building, strategically placing them to provide cooling across the affected areas.

Within 24 hours, the system was fully operational, restoring comfort in key office spaces and preventing any disruption to work. The rapid response not only ensured a comfortable environment for tenants but also reinforced the facilities team’s reputation for reliability and responsiveness.

Find out more about this project.

Weekend Packaged Chiller Installation – Brierley Hill, Dudley

Packaged Chiller Hire in West Midlands
Background

A facility management company in the West Midlands approached Rapid Energy for a temporary cooling solution for a large office space due to a significant delay in receiving their new chiller. The request came through a referral, reflecting the satisfaction of our existing clients with our services.

Equipment Used
Solution

To minimise disruption, Rapid Energy scheduled the installation over the weekend. The 250kW Packaged Chiller was positioned in a secure, walled compound, so we gathered precise measurements for the installation process. Delivered early on the scheduled weekend, the chiller was fully commissioned by midday Saturday, ensuring the client maintained cooling with minimal downtime while awaiting the permanent replacement.

Read the full solution here.

Why Offices Trust Rapid Energy

  • Speed Matters: With our nationwide network, we ensure rapid deployment of temperature control solutions, minimising downtime for your business.
  • Tailored Engineering: Our expert team conducts detailed surveys and calculations to specify the exact solution for your unique needs.
  • Expert Support: From initial consultation to seamless installation and ongoing support, we guide you through every step of the process.
  • Health & Safety First: We prioritise the health and safety of your staff and workplace, ensuring all equipment is installed and operated in full compliance with industry standards.

Whether it’s an emergency breakdown or a planned project, our team is ready to help keep your operations running smoothly, with zero compromise on comfort or continuity.

Call us on 0800 464 7025 or email us at hire@rapidenergy.co.uk.

  • FEBE Growth 100 2025
  • FEBE 2024
  • Neutral Carbon Zone Gold Certification
  • ISO-9001 Certified Logo
  • OFTEC Accredited Logo
  • CHAS Accredited Logo
  • Constructionline Gold Logo
  • GAS Safe Logo
  • SSIP Logo
  • F-Gass Certified
  • SafeContractor Logo
  • Cyber Essentials Logo