Primary Objectives

Dalkia, a leading mechanical services company, faced a critical situation when a freezer failure at one of their client’s sites put a large quantity of food at risk of spoilage late on a Friday afternoon. To prevent significant financial losses and maintain their client’s trust, immediate action was essential.

  • Provide a rapid response to prevent food spoilage.
  • Deliver and set up a temporary freezer solution within a tight timeframe.
  • Ensure minimal disruption to the client’s operations.
3m Double Door Fridge or Freezer Trailer

Capacity:
9.5 m3

Weight:
3000 kg

Pay Load:
1750 kg

Temperature Range:
+3°C to – 20°C

Power:
4kVA Generator or 240v Power Outlet

Click here to learn more about our 3m Double Door Fridge or Freezer Trailer

Challenges

  • Timing: The urgent situation occurred late on a Friday, requiring a quick solution before the weekend.
  • Driver Regulations: Constraints on driver hours complicated immediate delivery logistics.
  • Site Preparation: Ensuring power availability and a suitable location for the temporary freezer trailer.

 

Rapid Energy swiftly responded to the emergency by providing a 3m double door freezer trailer.

 

Key Actions Taken

  • Power and Site Preparation: Coordinated with the client to prepare the site and confirm power availability.
  • Driver Coordination: Despite driver availability challenges, a driver was scheduled for early Saturday morning.
  • Out-of-Hours Delivery: The freezer trailer was operational by 8:00 AM on Saturday.

Installation and location

Results

  • Timely Delivery: The temporary freezer trailer was operational within 24 hours of the initial request for assistance.
  • Prevention of Food Spoilage: Rapid response saved a significant amount of food, preventing substantial financial losses for the client.

 

For emergency HVAC or Temporary Freezer Hire solutions, trust Rapid Energy to deliver a prompt and effective solution.

Customer Quote

Happy with the service we received. I rang late in the day on Friday, and the following morning at 8 the temp freezer was on site and working. This saved the food from the failed freezer, so the customer was extremely happy. Thanks again, Hannah.

Dave Cuff
Mechanical Supervisor

Get in touch

  • Drop files here or
    Max. file size: 50 MB.
    • This field is for validation purposes and should be left unchanged.
    • FEBE 2024
    • ISO-9001 Certified Logo
    • OFTEC Accredited Logo
    • CHAS Accredited Logo
    • Constructionline Gold Logo
    • GAS Safe Logo
    • SSIP Logo
    • F-Gass Certified
    • SafeContractor Logo