Rapid Energy received an emergency call from a facilities management (FM) client following a boiler failure at a secure facility in Lincolnshire, which had resulted in the loss of heating and hot water. With both services essential to the day-to-day operation of the facility, the client needed a temporary boiler hire solution that could be mobilised quickly and restore the site to normal operation with minimal downtime.
The FM client called Rapid Energy late on a Friday afternoon, speed of response was critical, so the team immediately began working towards restoring the facility’s essential services.

Rapid Energy immediately began coordinating the engineers, transport and equipment required for the emergency boiler installation.
Throughout the response, the Rapid Energy team kept the client and their contractor updated as each stage progressed, helping the installation run smoothly from the initial call through to commissioning.

Heating and hot water were successfully restored within 24 hours of the initial emergency call, allowing the secure facility to return to operation and minimising disruption for the client.
By preparing equipment at the depot while the evening site survey was taking place, Rapid Energy was able to progress multiple stages simultaneously and reduce the overall time required to restore the site’s essential services.
The client was particularly pleased with the support provided throughout the emergency response and the speed at which the team mobilised to get the facility operational again.
Contact Rapid Energy to discuss your temporary boiler hire requirements.
“From late Friday afternoon through to the completion of the works on Saturday, Emma [Key Account Manager at Rapid Energy] maintained constant communication, providing regular updates and making herself readily available to answer calls and respond to any queries. Her proactive approach, responsiveness, and commitment to keeping all parties informed made what was a highly pressured situation run as smoothly as possible.